I thought I’d put a bit of a report on here for everyone to see, a little on the late side as I’ve only just managed to sort out and fill in the gaps in the log! We had a good few hours operating GS4AGG up at the club shack, over the 3 hours we’d made nearly 70 QSOs, with some repeat call ins… although this isn’t a contest so it doesn’t really matter too much how many you make, the aim is purely about promoting activity on the 2m band (specifically FM). It’s supposed to operate like a traditional net, but in reality that doesn’t end up being the case so much, in my experience the vast majority just call in, some come back later on.
As most of you are aware the shack tower is still not reinstated, however the temporary pole setup that we’d figured out, and Archie helped put up on both our test run and the actual event worked pretty well. Not quite as well as it would’ve been on the tower when extended but by most accounts we were still putting out a very strong signal.
I should hope so after spending £50 getting a 15m length of fancy italian coax to use, rather than an old length of RG213 that was lying about that’s probably older than me! In theory that worked out to us putting out about 170W ERP.
Overall everything went pretty smoothly and we managed to put the station on for the full 3 hours, with only a couple of quieter periods for 5 mins or so. The station was operated by myself, Jack GM4COX and Ernie GM0EZP, with support from Archie GM4KNU and David MM7FZU.